Skip to content
QuoteToPaid

Free flooring estimate template

Quote hardwood, LVP, laminate and tile jobs by the square foot with removal, prep, material and trim each on their own line. Customers see exactly where the money goes, and you can turn the estimate into an invoice when the last transition is down.

Download asPDFWordExcel· opens in Google Docs

Uses the Trade Pro design. The builder starts with typical flooring lines you can edit.

Oakline Floors610 Commerce Dr, Charlotte, NC 28206 · (704) 555-0161License #: NC-GC-77310
EstimateNo. EST-001
CustomerRachel Moore3120 Selwyn Ave, Charlotte, NC 28209
Job site3120 Selwyn Ave, Charlotte, NC 28209Job ref: FL-412
DatesIssued: Oct 5, 2026Valid until: Nov 4, 2026
Labor
TaskHoursRateAmount
Remove and dispose of carpet and pad6200.75465.00
Subfloor prep and leveling660.00360.00
Install LVP, click-lock6202.251,395.00
Materials
ItemQtyUnitAmount
Luxury vinyl plank (incl. 10% waste)682 sq ft3.102,114.20
Underlayment682 sq ft0.45306.90
Transitions and quarter round1 lot240.00240.00
Notes & termsFurniture moving not included. Subfloor repairs beyond leveling quoted separately if needed.This estimate is valid until the date shown. It is based on the work described above; the final price may change if the scope changes or hidden conditions are found.
Labor$2,220.00
Materials$2,661.10
Tax (7.25%)$353.88
Deposit required$1,500.00
Balance on completion$3,734.98
Customer signature: ____________________

Example with sample details. Yours will show your business and customer.

How to write a flooring estimate

  1. 1

    Measure every room

    Measure length by width for each room and closet, then add them up. Note stairs separately; they are priced per step.

  2. 2

    Add waste to the material

    Order about 10 percent extra for straight lays and 15 percent for diagonal or herringbone patterns.

  3. 3

    Price removal and prep on their own lines

    Tear-out, disposal and leveling vary a lot from job to job. Showing them separately explains the price.

  4. 4

    List the finishing pieces

    Transitions, stair nosing, baseboard or quarter round and underlayment each get a line.

  5. 5

    Note what is excluded

    Moving furniture, appliance disconnects and subfloor repairs are common exclusions. Put them in the notes.

What to include on a flooring estimate

  • Square footage per room and the total
  • Removal and disposal of the old floor
  • Subfloor prep, leveling or moisture barrier
  • Flooring product, color and quantity including waste
  • Underlayment, transitions, trim and stair parts
  • Deposit, start date and how long the price is valid

Pricing tips for flooring installers

Price labor by the square foot

Installers usually quote install labor per square foot by floor type, with tile and herringbone at a higher rate than click-lock plank.

Charge for stairs per step

Stairs take far longer than open floor. A per-step price keeps them from eating your margin.

Let customers supply material carefully

If the customer buys the flooring, say in writing that you are not responsible for shortages or defects in material you didn't supply.

Questions flooring installers ask

How much extra flooring should I add for waste?

About 10 percent for straight installs in simple rooms, and 15 percent or more for diagonal layouts, herringbone or rooms with many corners.

Should removal of the old floor be a separate line?

Yes. Removal and disposal costs vary with the old material, and listing them lets the customer see the price of a full install against a floor-over job.

How do I price stairs?

Most installers charge per step, including the tread, riser and nosing, rather than by square foot.

Is this template really free?

Yes. Fill it in online and download PDF, Word or Excel as often as you like. There is no sign-up, no watermark and nothing to install. Your details stay in your own browser.

Templates for other trades

Ready to send your next flooring estimate?

It takes about five minutes. Your work stays in your browser.

Fill it online free