Free construction estimate template
A clear estimate for remodels, additions and repairs, with labor and materials in separate tables, a deposit and a signature line. Fill it in online and download it in minutes, free and with no sign-up.
Uses the Trade Pro design. The builder starts with typical construction lines you can edit.
Example with sample details. Yours will show your business and customer.
What should a construction estimate include?
A construction estimate is a written price for a building or remodeling job, given before work starts, that breaks the cost into labor, materials, permits and other charges so the customer can approve it. A construction estimate should include your business name, contact details and contractor license number; the customer and the job site address; labor by task with hours and rate; materials with quantity and unit price; permit fees, sales tax and the deposit you need to start; and how long the price is valid and a line for the customer's signature. Hidden problems show up once walls are open. Many contractors add 10 to 15 percent, either as a separate line or built into labor. Send it before the job starts, keep a copy, and convert it into an invoice once the customer approves and the work is done.
Last updated · By Yasir Arfat
How to write a construction estimate
- 1
List labor by task
Break the job into tasks with hours and an hourly rate, so the customer sees where time goes.
- 2
Price materials separately
Lumber, fixtures and supplies go in their own table with quantity and unit price.
- 3
Add permits, tax and a deposit
Put permit fees on their own line, set your sales tax rate and ask for a deposit before work starts.
- 4
Set how long the price holds
Material prices move. Thirty days is the default; shorten it for volatile jobs.
- 5
Get it signed
The customer signs to accept. When the job is done, convert the estimate into an invoice in one tap.
Sample construction estimate: example, line by line
Here is the sample from the preview above, written out so you can see how each line adds up. Swap in your own scope, quantities and prices.
| Item | Qty × rate | Amount |
|---|---|---|
| Demolition and haul-away | 8 hrs × $65.00 | $520.00 |
| Framing and drywall | 24 hrs × $70.00 | $1,680.00 |
| Finish carpentry | 10 hrs × $75.00 | $750.00 |
| Lumber package | 1 lot × $1,240.00 | $1,240.00 |
| Drywall sheets 4x8 | 36 ea × $16.50 | $594.00 |
| Fasteners and adhesive | 1 lot × $85.00 | $85.00 |
| Labor | $2,950.00 | |
| Materials | $1,919.00 | |
| Tax (4.81%) | $234.20 | |
| Estimate total | $5,103.20 | |
Sample business and customer, not real people. Open this example in the builder and change anything.
Printable construction estimate: PDF, Word or Excel
- PDF: best for emailing or printing. It looks the same on every phone and computer, and the customer cannot change it.
- Word (.docx): edit the wording later in Microsoft Word or Google Docs, or keep it as your own reusable construction estimate form.
- Excel (.xlsx): line amounts, tax and the total are live formulas, so changing a quantity updates the estimate for you.
Fill it in online once and download any of the three. Prefer a blank file? estimate template for Excel, estimate template for Word, estimate template for Google Docs or estimate template for Google Sheets.
Job approved and ready for your crew? Turn it into a work order with the tasks, who is assigned and the priority.
Construction estimate checklist
- Your business name, contact details and contractor license number
- The customer and the job site address
- Labor by task with hours and rate
- Materials with quantity and unit price
- Permit fees, sales tax and the deposit you need to start
- How long the price is valid and a line for the customer's signature
Pricing tips for contractors
Work out your prices with the markup calculator, labor cost calculator and hourly rate calculator.
Add a contingency
Hidden problems show up once walls are open. Many contractors add 10 to 15 percent, either as a separate line or built into labor.
Price materials at today's cost
Get current supplier prices and keep the validity period short when lumber or copper is moving.
Ask for a deposit
A deposit covers materials and secures the slot in your schedule. Check your state's limits on residential deposits.
Questions contractors ask
What should a construction estimate include?
Your business name, contact details and license number; the customer and job site; labor and materials as separate lines with quantity and price; permits; tax; any deposit; how long the price is valid; and a place for the customer to sign.
Is this template really free?
Yes. Fill it in online and download PDF, Word or Excel as often as you like. There is no sign-up, no watermark and nothing to install. Your details stay in your own browser.
Can I turn the estimate into an invoice later?
Yes. When the job is done, open the estimate and tap Convert to invoice. Everything is copied over with a new invoice number.
How long should a construction estimate be valid?
Thirty days is common because material prices change. The template sets 30 days by default and you can change the date.
Templates for other trades
- Roofing estimate
- Painting estimate
- Electrical estimate
- Landscaping estimate
- Flooring estimate
- Concrete estimate
- Fencing estimate
- Carpentry estimate
- Lawn care estimate
- Moving estimate
- Plumbing estimate
- HVAC estimate
- Cleaning estimate
- Plumbing invoice
- HVAC invoice
- Handyman invoice
- Cleaning invoice
- Lawn care invoice
- Auto repair invoice
- Pest control invoice
- Pressure washing invoice
- Photography invoice
- Personal training invoice
- Tutoring invoice
- Contractor invoice
- Construction invoice
- Freelance invoice
- Cash receipt
- Payment receipt
- Rent receipt
- Sales receipt
- Roofing invoice
- Painting invoice
- Electrical invoice
Ready to price your next job?
It takes about five minutes. Your work stays in your browser.
Fill it online free