Skip to content
QuoteToPaid

Free construction invoice template

An invoice for construction companies and builders billing in stages. Show the work done this period, subcontractors, materials and change orders, take off what has already been paid, and tie it all to the contract.

Download asPDFWordExcel· opens in Google Docs

Uses the Trade Pro design. The builder starts with typical construction lines you can edit.

Ridgeline Builders1450 Industrial Pkwy, Phoenix, AZ 85043 · (602) 555-0147billing@ridgelinebuilders.comLicense #: Lic. 00-48213
InvoiceNo. INV-001
CustomerDana Marlow210 W Monroe St, Phoenix, AZ 85003dana@marlowproperties.com
Job site78 E Camelback Rd, Suite 200, Phoenix, AZ 85012Job ref: Contract C-2214 · Progress billing 2 of 4
DatesCompleted: Oct 30, 2026Due: Oct 19, 2026
Labor
TaskHoursRateAmount
Framing and blocking9665.006,240.00
Drywall hang and finish7258.004,176.00
Subcontractor: electrical rough-in16,800.006,800.00
Materials
ItemQtyUnitAmount
Lumber and steel studs1 lot5,320.005,320.00
Drywall sheets 4x8140 ea16.002,240.00
Warranty & notesProgress billing for work completed through the service date. Lien waiver for this payment sent on request.Payment is due by the due date shown. Thank you for your business.
Labor$17,216.00
Materials$7,560.00
Total$24,776.00
Deposit paid-$8,000.00
Balance due$16,776.00
Pay to: ACH: Western Trust Bank, account 7730 1184 26 · Check to Ridgeline Builders · Reference: INV-001Customer signature: ____________________

Example with sample details. Yours will show your business and customer.

What should a construction invoice include?

A construction invoice is the bill a builder or construction company sends for work on a project, usually at agreed stages, listing the labor, subcontractors, materials and change orders for that period, any retainage held, and the amount now due. A construction invoice should include business name, contact details and license number; customer or property owner, and the job address; contract number, billing stage and the period covered; labor, subcontractors and materials for this period; change orders as separate lines; retainage held, deposit or earlier payments, and the balance due; and payment terms, payment methods and any lien waiver. Set out when you bill in the contract, by date or by milestone such as rough-in or drywall. Then each invoice has a clear trigger. Send it as soon as the work is finished, keep a copy for your records, and follow up politely a few days before it is due.

Also called: construction billing invoice, construction company invoice, progress invoice, builder progress billing, construction bill. It is the same document, and this template works for all of them.

Last updated · By Yasir Arfat

How to write a construction invoice

  1. 1

    Tie it to the contract

    Put the contract number and billing stage in the job reference, such as "Progress billing 2 of 4", and add the job address and your license number.

  2. 2

    Bill only this period's work

    List the labor, subcontractors and materials for the stage you are billing, so the customer can check them against the site and the schedule of values.

  3. 3

    Show change orders on their own lines

    Start each one with the change order number, so approved extra work is easy to tell apart from the original contract.

  4. 4

    Take off retainage and earlier payments

    If the contract holds retainage, add a line such as "Less 10% retainage" with a negative rate. Enter any deposit in Deposit paid, and the invoice shows the balance due.

  5. 5

    Send it with the paperwork the contract asks for

    Add payment terms and how to pay, then email the PDF along with any lien waiver or pay application the contract requires.

Sample construction invoice: example, line by line

This sample is the second of four progress billings on an office build-out: the work done this period, one subcontractor, materials, and the deposit taken off the balance. Swap in your own lines and rates.

Sample construction invoice line items and totals
ItemQty × rateAmount
Framing and blocking96 hrs × $65.00$6,240.00
Drywall hang and finish72 hrs × $58.00$4,176.00
Subcontractor: electrical rough-in1 lot × $6,800.00$6,800.00
Lumber and steel studs1 lot × $5,320.00$5,320.00
Drywall sheets 4x8140 ea × $16.00$2,240.00
Labor$17,216.00
Materials$7,560.00
Balance due$16,776.00

Sample business and customer, not real people. Open this example in the builder and change anything.

Printable construction invoice: PDF, Word or Excel

  • PDF: best for emailing or printing. It looks the same on every phone and computer, and the customer cannot change it.
  • Word (.docx): edit the wording later in Microsoft Word or Google Docs, or keep it as your own reusable construction invoice form.
  • Excel (.xlsx): line amounts, tax and the total are live formulas, so changing a quantity updates the invoice for you.

Fill it in online once and download any of the three. Prefer a blank file? invoice template for Excel, invoice template for Word, invoice template for Google Docs, invoice template for Google Sheets or invoice template as a printable PDF.

Customer already paid? Make a construction receipt in the same design with the free receipt maker, or see the payment receipt template. Need paying before you start? Send a proforma invoice.

Construction invoice checklist

  • Business name, contact details and license number
  • Customer or property owner, and the job address
  • Contract number, billing stage and the period covered
  • Labor, subcontractors and materials for this period
  • Change orders as separate lines
  • Retainage held, deposit or earlier payments, and the balance due
  • Payment terms, payment methods and any lien waiver

Billing tips for construction companies

Work out your prices with the markup calculator, labor cost calculator and hourly rate calculator.

Agree the billing stages up front

Set out when you bill in the contract, by date or by milestone such as rough-in or drywall. Then each invoice has a clear trigger.

Track retainage separately

Retainage is often 5 to 10 percent, and some states limit it. Keep a running total so you can bill the full amount when it is released.

Check your lien deadlines

Lien rights and notice deadlines differ by state, and missing one can cost you the right to claim. Check them before a job starts, not when a payment is late.

Questions construction companies ask

What should a construction invoice include?

Your business and license number, the customer and job address, the contract number and billing stage, labor, subcontractors and materials for the period, change orders, any retainage and earlier payments, the balance due, payment terms and how to pay.

What is progress billing in construction?

Progress billing means invoicing in stages as the work advances, instead of one bill at the end. Each invoice covers the work done since the last one, which keeps cash coming in on longer jobs.

How do I show retainage on a construction invoice?

Add a line such as "Less 10% retainage" with quantity 1 and a negative rate equal to the amount held. It comes off the total. When the retainage is released, bill it on its own invoice as a positive line.

Is this the same as an AIA pay application?

No. Some commercial contracts require a pay application on AIA G702 and G703 forms, which this template does not replace. For jobs that do not ask for those forms, an itemized invoice like this one is usually enough.

What is the difference between a construction invoice and a contractor invoice?

They are close. This page focuses on projects billed in stages, with subcontractors and retainage. The contractor invoice template suits a single remodel or repair billed when the job is finished.

Do I charge sales tax on a construction invoice?

It depends on the state and the type of work. Some states tax materials, some tax the whole contract and some treat new construction differently. Check your state's rules or ask your accountant, then set the rate in the tax field.

Is this template really free?

Yes. Fill it in online and download PDF, Word or Excel as often as you like. There is no sign-up, no watermark and nothing to install. Your details stay in your own browser.

Templates for other trades

Ready to send your next progress billing?

It takes about five minutes. Your work stays in your browser.

Fill it online free